Serving the Air Conditioning Industry since 1968. Our company designs and manufactures Switchboards for all your electrical needs from the smallest control panel to major motor control centres and main switchboards. Our site teams are very experienced in Insurance Rectification Works, and the wiring of all Air Conditioning, Ventilation, Pumping Stations, Water Treatment, Building Management and CO Systems.
TES Mechanical Electrical has been providing service to the air conditioning industry since 1968. This work includes all electrical needs for motor control centres, air conditioning, ventilation, pumping stations, water treatment, building management and C02 systems. Tower 1 is the largest commercial tower constructed in the commercial development at the AU$6 billion Barangaroo project.
Barangaroo is the most extensive urban renewal project in Sydney since the 2000 Olympic Games, with plans for it to become Sydney's future economic precinct. Together the three towers provide around 490,000 sqm of grade A commercial space.
TES Mechanical Electrical has been providing service to the air conditioning industry since 1968. This work includes all electrical needs for motor control centres, air conditioning, ventilation, pumping stations, water treatment, building management and C02 systems. Tower 1 is the largest commercial tower constructed in the commercial development at the AU$6 billion Barangaroo project.
Barangaroo is the most extensive urban renewal project in Sydney since the 2000 Olympic Games, with plans for it to become Sydney's future economic precinct. Together the three towers provide around 490,000 sqm of grade A commercial space.
Services
TES Mechanical Electrical has provided services to the air conditioning industry since 1968, including BMCS Installation, Mechanical Service Wiring, Switchboard Design & Manufacture and more. The BMCS Installation division of TES is a dedicated team of electricians specialising in control wiring. TES have over 50 years of experience, designing and building all types of Switchboards and Motor Control Panels including Forms 1, 2, 3B & 4B.
Reviews
Be the first to review TES Mechanical Electrical.
Write a Review